
1 November 2026
Home Renovations in Kellyville: Approvals and What to Check
A practical Kellyville renovation checklist covering council controls, approval pathways, older homes, estate lots, BASIX and owner protections.
Home renovations in Kellyville are usually internal updates, ground-floor extensions or first-floor additions. Minor work can be exempt, alterations and additions that meet the Housing Code can be complying development within 20 days, and other work needs a development application. Most of Kellyville is under The Hills Shire Council, while Kellyville Ridge is in Blacktown City.
Key facts
- Most of Kellyville is administered by The Hills Shire Council under The Hills Local Environmental Plan 2019; neighbouring Kellyville Ridge is in Blacktown City.
- NSW Planning lists North Kellyville as a 707-hectare precinct in the North West Growth Area, with its own North Kellyville Precinct Development Control Plan (March 2018).
- The Housing Code covers some alterations and additions as complying development, with certificates able to be issued within 20 days when the work meets the requirements.
- BASIX applies to renovations valued at $50,000 or more.
- Work over $5,000 needs a licensed builder. For work over $20,000, the builder must show you home building compensation cover before work starts or you pay any money.
Which council and controls apply in Kellyville?
Check the council for your street, any North Kellyville precinct controls and your property's constraints before design work progresses. These local details can change the approval pathway and the way an addition is planned.
Most of Kellyville sits within The Hills Shire Council and The Hills Local Environmental Plan 2019. Neighbouring Kellyville Ridge is administered by Blacktown City, so check the council for your street rather than relying on the suburb name alone.
North Kellyville is a growth-area precinct with its own North Kellyville Precinct Development Control Plan. Your section 10.7 planning certificate from council shows relevant controls and constraints for the property. Heritage, bush fire or flood mapping can mean the work goes to council as a development application.
Our Kellyville area page explains how we look at blocks in the suburb. Confirm the controls for your own property on its planning certificate.
Which approval pathway applies?
The approval pathway depends on the work and whether it meets the relevant standards. Some minor renovations are exempt, qualifying alterations and additions may use complying development, and other work requires a development application.
| Pathway | When it may apply | Important check |
|---|---|---|
| Exempt development | Some minor renovations and low-impact building work | The work must meet the Codes SEPP standards. For buildings built before 1987, have a qualified professional check for asbestos first. |
| Complying development | Alterations and additions that meet the Housing Code requirements | The Housing Code includes R1, R2, R3, R4 and RU5 zones and an 8.5 m maximum height. A complying development certificate can be issued within 20 days when requirements are met. |
| Development application | Work that does not meet the relevant exempt or complying development requirements | Heritage, bush fire and flood constraints may require a DA to council. |
Read the NSW Planning Housing Code and exempt development guidance before selecting a pathway. Do not assume that a particular type of addition automatically uses one approval route.
What should you check in an older home or estate lot?
Older homes need a careful existing-building review, while estate homes need title and design-control checks. Both affect the design brief before construction planning begins.
Older brick homes
Kellyville includes older brick homes on generous blocks as well as newer estate homes. If the home was built before the late 1980s, it may contain asbestos. NSW Planning advises having a qualified professional check for asbestos before work on a building built before 1987, and SafeWork NSW asbestos guidance sets licence rules for removal.
Any amount of friable asbestos requires a friable asbestos licence. More than 10 square metres of non-friable asbestos also requires a licence. Arrange the appropriate professional assessment before disturbing older materials.
Estate homes
Before finalising an extension or external change, check the title for restrictions and review the estate's design guidelines. These may affect the design decisions you can make, so include them with the planning and site information.
Should you renovate, extend or go up?
The right direction depends on how your existing home, site and daily needs fit together. Internal renovation changes rooms and finishes; an extension changes the footprint; a first-floor addition changes the roof, structure and circulation.
| Option | What changes | Checks to raise early |
|---|---|---|
| Internal renovation | Room layouts, finishes, fixtures and services within the existing footprint | Existing structure, access, services and how new work connects to old areas |
| Ground-floor extension | The footprint, external walls, roof connection and potentially covered outdoor living | Site constraints, drainage, access, services and the applicable approval pathway |
| First-floor addition | The roof structure, upper-level structure, stairs, services and internal circulation | Whether the existing home can support the design and which controls and approvals apply |
If a renovation no longer suits the existing structure or site, compare the options with a clear brief. Our guide to knockdown rebuild versus renovation helps with that decision.
What BASIX and owner protections apply?
BASIX applies to renovation work valued at $50,000 or more, and the owner is responsible for appointing the certifier. You should also check the builder's licence, insurance evidence, deposit and warranty terms before work starts.
- Use a licensed builder for residential building work over $5,000.
- For work over $20,000, obtain evidence of home building compensation cover before work starts or any money is paid.
- The maximum deposit before work starts is 10 per cent.
- Statutory warranties cover major defects for six years and other defects for two years.
Check the NSW Planning BASIX guidance and the NSW Consumer Building Guide for these requirements.
How do we approach a Kellyville renovation?
We review the existing home and plan the connection between old and new work before construction coordination. Our renovations service covers an existing-home review, extension and renovation planning, material and finish guidance, and construction coordination.
Our eight steps are:
- Initial consultation
- Site review
- Concept and design
- Estimate and proposal
- Approvals pathway
- Selections
- Construction updates
- Handover
During the review, we consider the existing structure, access, services, staging and how the new work connects to the old home. See the renovations and extensions service for the scope of this work.
Frequently asked questions
Do I need council approval to renovate in Kellyville?
Not every renovation needs a development application. Some minor work may be exempt development, while alterations and additions that meet the Housing Code may use complying development. Work that does not meet those requirements may need a development application. Check the council boundary, property controls and section 10.7 planning certificate before choosing the pathway.
Which council covers Kellyville?
Most of Kellyville is administered by The Hills Shire Council under The Hills Local Environmental Plan 2019. Neighbouring Kellyville Ridge is in Blacktown City instead. Confirm the council for your street because the suburb name alone does not establish which planning authority applies to your property.
Can a renovation be exempt development?
Some minor renovations and low-impact building works can be exempt development if they meet the Codes SEPP standards. This is not automatic. Check the work against the current requirements, and for a building built before 1987, NSW Planning advises an asbestos check by a qualified professional first.
Does my older Kellyville home have asbestos?
A home built before the late 1980s may contain asbestos, but only an appropriate inspection can identify the materials at a property. Before disturbing older materials, arrange a qualified check. SafeWork NSW licence rules apply to friable asbestos and to more than 10 square metres of non-friable asbestos.
Should I renovate or knock down and rebuild?
Compare the existing structure, the site, the required rooms and the way the proposed work connects to the home. Renovation may suit a home that can support the changes, while rebuilding is another option when the existing layout or structure does not suit the brief. Review both paths before committing to design work.
Next step: confirm which council covers your street and order your 10.7 planning certificate, then talk to us about your Kellyville home and the changes you have in mind.
