60m² Granny Flat Designs

Western Sydney craftsmanship

60m² Granny Flat Designs & Planning Checks

Full 60m² 2-bedroom granny flat designs to assess against the NSW Housing SEPP and the complete site requirements for the property.

Tailored designClear approvalsPremium delivery

About this category

3 60m² granny flat designs designs.

NSW Planning describes 60m² as the general secondary-dwelling floor-area limit unless another applicable planning instrument permits a greater area. Every design in this collection uses that full internal area to explore a two-bedroom layout.

Staying within 60m² does not by itself make a project complying development. The lot, existing home, constraints, attached structures, setbacks, landscaping and every applicable Housing SEPP standard must also be checked.

Harbour 55

55m² · Single Storey

Harbour 55

2-bedroom granny flat with combined living, dedicated laundry and covered patio.

Beds

2

Baths

1

Area

55m²

Beacon 60

60m² · Single Storey

Beacon 60

Full 60m² 2-bedroom granny flat concept, subject to the applicable NSW planning controls.

Beds

2

Baths

1

Area

60m²

Willow 60

60m² · Single Storey

Willow 60

60m² 2-bed granny flat concept with an ensuite off the main bedroom.

Beds

2

Baths

2

Area

60m²

Frequently asked

60m² Granny Flat Designs questions.

Why is the granny flat maximum 60m²?

The NSW Housing SEPP generally limits a secondary dwelling to 60m² or the maximum permitted by another applicable planning instrument. A larger proposal is not automatically prohibited, but its approval pathway and local controls must be checked.

What can you fit in a 60m² granny flat?

A 60m² concept can be planned with two bedrooms, a bathroom, laundry and open-plan kitchen and living space, subject to the final layout and building requirements. NSW Planning notes that attached carports, garages, balconies, decks, patios, pergolas, terraces and verandahs are relevant to the site-area calculations, so they must be assessed rather than assumed to sit outside the controls.

How long does CDC approval take for a 60m² granny flat?

NSW Planning says complying-development approvals can be issued in as little as 20 days when all requirements are met. That published figure is not a guarantee and does not include the time needed for investigations, design and complete documentation.