You've heard about granny flats built 'without council approval' — here's what that actually means (spoiler: not what most people think).

Tailored designClear approvalsPremium delivery

The reality: no such thing as 'no approval'

Let's clear this up first — you cannot legally build a permanent granny flat in NSW without any form of approval. What people mean by 'no council approval' is the Complying Development Certificate (CDC) pathway, which bypasses your local council and goes through a private certifier instead.

CDC is a legitimate, well-established alternative pathway created by the NSW State Environmental Planning Policy (Housing) 2021. It's not a loophole — it's the government's fast-track option for granny flats that meet a strict set of criteria.

Why CDC exists and why owners prefer it

The Development Application (DA) pathway through council takes 3–6 months on average. Councils are under-resourced, applications get held up in queues, and neighbours can lodge objections that delay approval further.

CDC approval takes as little as 10 business days once your application is lodged with a private certifier. There's no council queue, no neighbour notification, and no discretionary planning assessment. If your project meets every criteria, approval is essentially guaranteed.

This speed premium is why 80%+ of new granny flats in NSW go the CDC route.

Strict eligibility — the 60m² rule and beyond

CDC pathway comes with strict, non-negotiable requirements. The critical ones: minimum 450m² block size, maximum 60m² internal floor area for the granny flat, minimum setbacks (typically 3m rear, 0.9m side, 3m from primary dwelling), retention of 24m² of usable outdoor space (min 4x4m) for the primary dwelling.

Single-storey only (two-storey granny flats require DA pathway). Height limits vary but typically 3.8m maximum. No subdivision of the title — the granny flat stays on the same title as the primary home.

If your project misses ANY of these criteria, CDC is off the table and you're back to DA pathway with council.

About 'portable' granny flats

You may see marketing for 'portable' or 'transportable' granny flats claiming no approval needed. Be cautious. Truly portable structures (like a caravan or genuinely mobile cabin) may not require approval if they meet very specific criteria — but permanent, plumbed, connected dwellings virtually always require CDC or DA approval regardless of whether they arrive on a truck.

The safest position: assume you need CDC or DA approval and design accordingly. A qualified certifier or your builder can advise on your specific block and project.

Frequently asked

Common questions.

Can you build a granny flat without council approval in NSW?

Not without any approval — but you can bypass council via the CDC (Complying Development Certificate) pathway, which uses a private certifier and takes as little as 10 business days. Your project must meet strict criteria (60m² max, 450m² min block, setbacks, single-storey).

How fast is CDC approval for a granny flat?

As little as 10 business days once your CDC application is lodged with complete documentation. The design and documentation phase typically adds 4–8 weeks before lodgement.

Do I need approval for a portable granny flat?

In almost all cases, yes. Only truly portable structures (like caravans meeting specific criteria) may not require approval. Permanent, plumbed, connected dwellings virtually always require CDC or DA approval regardless of construction method.